The entire commercial 20 units approximately 350 Square meter each into a truck maintenance facility with installation of new 19 insulated sectional overhead doors with electrical operation and 20 front aluminum glazing doors with huge demolition of concrete blocks and stud framing. The project also included two layers of asphalt for approximately 7500 sq.meter with granular B compaction and concrete ramp and retaining wall at the backside of overhead doors to ensure the truck into the facility.